TheAPGENCO exam was held on 23rd of April 2017 . You can download the Question paper(EE) and key from the links given below :
Question paper (SET_A) : Download
Final key : Download
Download the Question paper and key of APTRANSCO 2017 held on 30-04-2017 below:
Question paper (SET_A) : Download
Final key : Download
Exam Pattern for APGENCO and APTRANSCO:
- Total 100 Questions
- Duration 2 Hours
- 70 Marks from Technical (Core subjects) & 30 Marks from Aptitude
- All questions are Objective type multiple choice questions.
- There is no negative marking for the wrong answers
- Each Question carries 1 Mark
- Minimum Qualifying Cutoff Marks:
For OC: 40 Marks
For BC: 35 Marks
SC/ST/PH: 30 Marks
ALSO CHECK
Notification for Telangana PSUs 2017
More about APGENCO:
The erstwhile Andhra Pradesh State Electricity Board which came into existence in 1959 was unbundled into one Generating Company (APGENCO), One Transmission Company(APTRANSCO) and Four Distribution Companies (APDISCOMs) under Andhra Pradesh Electricity Reforms Act,1998.
APGENCO came into existence and commenced operations from 01.02.1999. This was a sequel to Governments reforms in Power Sector to unbundle the activities relating to Generation, Transmission and Distribution of Power. All the Generating Stations owned by erstwhile APSEB were transferred to the control of APGENCO.After the reorganisation of state of the Andhra Pradesh according to Andhra Pradesh Reorganisation Act, 2014, the assets, liabilities, employees etc. of APGENCO are apportioned between the two successor states.
The installed capacity of APGENCO as on 05.01.2017 after Andhra Pradesh State Reorganisaton is 4612.6MW comprising 2810.0MW Thermal, 1797.6 MW Hydro and 5 MW Solar Power stations and contributes 41% of total Energy Requirement of Andhra Pradesh.
More about APTRANSCO:
APTRANSCO came into existence on 1.02.1999.From Feb 1999 to June 2005 APTRANSCO remained as Single buyer in the state-Purchasing power from various Generators and selling it to DISCOMs in accordance with the terms and conditions of the individual PPAs at Bulk Supply Tariff(BST) rates. Subsequently,in accordance with the Third Transfer Scheme notified by GOAP,APTRANSCO ceased to do power trading and has retained powers of controlling system operations of Power Transmission
The installed capacity of APGENCO as on 05.01.2017 after Andhra Pradesh State Reorganisaton is 4612.6MW comprising 2810.0MW Thermal, 1797.6 MW Hydro and 5 MW Solar Power stations and contributes 41% of total Energy Requirement of Andhra Pradesh.
More about APTRANSCO:
APTRANSCO came into existence on 1.02.1999.From Feb 1999 to June 2005 APTRANSCO remained as Single buyer in the state-Purchasing power from various Generators and selling it to DISCOMs in accordance with the terms and conditions of the individual PPAs at Bulk Supply Tariff(BST) rates. Subsequently,in accordance with the Third Transfer Scheme notified by GOAP,APTRANSCO ceased to do power trading and has retained powers of controlling system operations of Power Transmission
Bro. Send me set B
ReplyDeleteThey kept only set A Suzeet. Download the set A paper and compare it with set B. It's not so difficult to match the questions as they're almost in sequence.
DeleteThank you teja
Delete